Bid Package #1 - EDS Screening Building
|
|
Bid proposals for Bid Package #1 were received by Hensel Phelps on June 21, 2007 and after performing a review of the proposals, the following are the results:
1A Roofing
|
|
|
1 - Alliance Roofing
|
|
|
2 - Legacy Roofing
|
1B Drywall, Insulation, Sheathing, Hollow Metal Doors & Frames, Metal Sliding Doors and Hardware
|
| |
1 - Insul Acoustics
|
| |
2 - Allen Specialties
|
| |
3 - J & J Acoustics
|
|
Bid Package #2 -
|
Escalators and Service Elevator
Emergency Exit Stairs and Material Receiving Area
|
|
Bid proposals for Bid Package #2.1 were received by Hensel Phelps on August 15, 2007 and after performing a review of the proposals, the following are the results:
2.1A Elevators & Escalators
|
|
|
1 - Schindler Elevator Corporation
|
|
|
2 - ThyssenKrupp Elevator
|
Bid proposals for Bid Package #2.2 were received by Hensel Phelps on August 21, 2007 and after performing a review of the proposals, the following are the results:
2.2A Building and Selective Demolition
|
|
|
1 - Joseph J. Albanese, Inc.
|
| |
2 - Roldan Construction
|
2.2B Form, Place, and Finish Cast-In-Place Concrete
|
| |
1 - Joseph J. Albanese, Inc.
|
2.2C Concrete & CMU Reinforcing
|
| |
(N/A - Included in Subsystems 2.2B and 2.2D)
|
2.2D CMU
|
| |
1 - Dixon / Spencer Masonry, A Joint Venture
|
| |
2 - Bratton Masonry, Inc.
|
2.2E Misc. Metals & Ornamental Metals
|
| |
1 - Gilmore Steel, Inc.
|
2.2F Chain Link Fencing & Gates
|
| |
1 - Oliveira Fence Incorporated
|
| |
2 - North American Fence Co/Supply
|
2.2G Waterproofing & Joint Sealants
|
| |
1 - Alliance Roofing
|
| |
2 - F.D. Thomas, Inc.
|
|
Bid Package #3 - Superstructure and Foundations for Ticket Lobbies & Airside Expansion
|
|
Bid proposals for Bid Package #3 were received by Hensel Phelps on November 6, 2007 and after performing a review of the proposals, the following are the results:
3A Structural Steel & Miscellaneous Metals
|
|
|
1 - Olson & Co Steel
|
| |
2 - Westco Iron Works
|
| |
3 - Metal Works
|
3B Metal Decking
|
| |
1 - Pacific Erectors, Inc.
|
| |
2 - Anning-Johnson Company
|
| |
3 - B.T. Mancini Co., Inc.
|
3C Concrete Materials
|
| |
1 - CEMEX
|
| |
2 - Central Concrete Supply Co., Inc.
|
| |
3 - Graniterock
|
3D Concrete Reinforcing
|
| |
1 - Pacific Coast Steel
|
| |
2 - Regional Steel Corporation
|
3E Fireproofing
|
| |
1 - Anning-Johnson Company
|
| |
2 - F. Rodgers Corporation
|
| |
3 - LVI Environmental Services, Inc.
|
|
Bid Package #4 - EDS Screening Building Baggage Handling System
|
|
Bid proposals for Bid Package #4 were received by Hensel Phelps on November 6, 2007 and after performing a review of the proposals, the following are the results. Unfortunately a contract was not awarded as the baggage handling system work was ultimately eliminated from the scope of the EDS screening building project:
4A Baggage Handling System
|
| |
1 - The Horsley Co.
|
|
Bid Package #5 - Interior & Exterior Assemblies
|
|
Bid proposals for Bid Package #5 were received by Hensel Phelps on May 13, 2008 and after performing a review of the proposals, the following are the results:
5A Selective Building Interior Demolition
|
|
|
1 - Joseph J. Albanese, Inc.
|
|
|
2 - Roldan Construction, Inc.
|
|
|
3 - Stomper Co., Inc.
|
|
|
4 - Midwest Demolition of California
|
|
|
5 - LVI Environmental Services, Inc.
|
|
|
6 - Evans Brothers, Inc.
|
5B Expansion Joint Covers
|
|
|
1 - B.T. Mancini Co., Inc.
|
|
|
2 - Expansion Specialties, Inc.
|
|
|
3 - CM & B dba Mauck Sheet Metal
|
|
|
4 - Valley Sheet Metal Co.
|
5C Building Insulation
|
| |
1 - F. Rodgers Corporation
|
| |
2 - Alcal-Arcade Contracting, Inc.
|
5D Roofing
|
| |
1 - Andy’s Roofing Company, Inc.
|
| |
2 - Reinhardt Roofing, Inc.
|
| |
3 - F. Rodgers Corporation
|
|
|
4 - Alliance Roofing Company, Inc.
|
|
|
5 - Alcal-Arcade Contracting, Inc.
|
|
|
6 - Roofing Constructors, Inc.
|
|
|
7 - Best Contracting Services, Inc.
|
5E Flashing and Sheet Metal
|
| |
1 - WKW Mechanical Contractors, Inc.
|
| |
2 - CM & B dba Mauck Sheet Metal
|
| |
3 - Omni Sheet Metal, Inc.
|
5F Hollow Metal Doors, Frames and Hardware
|
| |
1 - Jones Materials, Inc.
|
| |
2 - Security Metal Products Corp.
|
| |
3 - PCI Doors
|
5G Drywall, Metal Stud Framing and Related
|
| |
1 - J & J Acoustics
|
| |
2 - Insul Acoustics North Inc.
|
| |
3 - Performance Contracting, Inc.
|
| |
4 - Daley’s Drywall & Taping
|
5H Portland Cement Plaster
|
| |
(Awarded with Subsystem 5G Drywall, Metal Stud Framing and Related)
|
5I Acoustical Ceilings
|
| |
1 - Acoustech, Inc.
|
| |
2 - T3, Inc.
|
| |
3 - San Francisco Interiors, Inc.
|
| |
4 - George Family Enerpirses, Inc.
|
5J Specialty Ceilings
|
| |
(Awarded with Subsystem 5I Acoustical Ceilings)
|
|
Bid Package #6 - Interior Finishes
|
|
Bid proposals for Bid Package #6 were received by Hensel Phelps on May 22, 2008 and after performing a review of the proposals, the following are the results:
6A Polished Concrete
|
|
|
(Not awarded due to elimination of polished concrete scope of work)
|
6B Column Covers, Stainless Steel Base, Stainless Steel Wainscot & Rolling Security Screens
|
|
|
(Not awarded)
|
6C Glass Railings
|
| |
1 - Columbia Fabricating Co.
|
| |
2 - Environmental Interiors, Inc.
|
6D Terrazzo Flooring
|
| |
1 - Corradini Corporation
|
| |
2 - Associated Terrazzo Co., Inc.
|
| |
3 - Marbella Flooring, Inc.
|
6E Carpet & VCT Flooring
|
| |
1 - MCC Flooring Contractors, Inc.
|
| |
2 - B.T. Mancini Co., Inc.
|
| |
3 - Hye Quality Floors Interiors
|
6F Paints & Coatings
|
| |
1 - C & C Painting & Decorating
|
| |
2 - A & B Painting, Inc.
|
| |
3 - Walters & Atlantis Painting
|
| |
4 - George E. Masker, Inc.
|
| |
5 - Jerry Thompson & Sons, Inc.
|
|
Bid Package #7 - Consolidated Woodwork and Signage
|
|
Bid Package #7 has been released for bidding, but bids have not been received by Hensel Phelps, therefore there are no results to review at this time.
|
© 2007-2008 Hensel Phelps Construction Co. All rights reserved.
|